Made de Madera
Guided ProjectLevel 2 · Beginner

«Strandad» Lamp

Three curved legs in solid kotibe, template-routed and finished with oil. The shade comes from Ikea's Strandad; everything else, you make yourself.

«Strandad» Lamp — Made de MaderaThe finished piece
Your project

A floor lamp with a wooden body, from zero to lit.

Strandad floor lamp with a kotibe frame
Level 2 / 5
Difficulty: Beginner

Template curves and hidden joints. A good second project.

~40 h
Estimated time

At your own pace. The guide gives the indicative time.

7 phases
From start to finish

From the kotibe board to the lamp assembled and switched on.

Tape-stacked parts
Headline technique

Plus template and bearing bit, dominoes and the drill press.

Inside the guide

A guide that takes you by the hand, step by step.

Every phase of the project is explained on pages like this one: what you're going to do, how long it takes, what protection you need and where it usually goes wrong. You're never left wondering what's next.

01Time and protectionBefore each step you know how long it takes and what gear you need.
02Clear explanationWhat to do and why, with the measurements and the exact tool.
03Every step, illustratedNumbered drawings of the machine and the part, just as you'll see them in the workshop.
04Warnings in timeThe most common mistakes, flagged before they happen.
Get the kit
FABRICACIÓN
RIELES FONDO ESTRUCTURA.
Duración:
30min
AtenciónGuantesMascarilla

Para finalizar con la estructura exterior se debe realizar un rail para incorporar el fondo de la estructura. Esta plancha que hará de fondo es de DM de 6 mm Esta operación se realizará en las 4 piezas que conforman la estructura (laterales, base y top). Hay que tener en cuenta a la hora de ensamblar las piezas que el top es la ultima pieza que se debe ensamblar de la estructura. Se usará una fresa de 6,3mm

Fresa de 6,3 mm
Ranura del fondo en el lateral
Time and protection
Ajuste de la altura de la fresa1Every step, illustrated

Se determina la altura a la que se alojará el fondo del cajón. Para determinar la altura de la fresa se gira con una llave el disco situado enfrente hasta que la fresa toque con la regla, donde previamente hemos tenido que colocar la altura a la que queremos la fresa

Mano sujetando la piezaGuía paralela de la fresadora2

El siguiente paso es ver a que distancia del borde se realiza el fresado. Nos ayudamos de la regla que hemos estado usando en el paso anterior para determinar la distancia, a la hora de medir la distancia tambien hay que tener en cuenta el diametro de la fresa una vez con la distancia conseguida se regula y se posiciona la guia paralela.

Avance de la pieza contra la guía3

Cada pieza se posiciona firmemente contra la guia de la máquina, manteniendo siempre la misma cara de referencia para asegurar la uniformidad en todas las ranuras. Se realiza el avance de forma continua y controlada.

Es importante evitar interrupciones bruscas o movimientos irregulares que puedan generar variaciones en el ancho o profundidad de la ranura.
Warnings in time

Una vez mecanizadas todas las piezas, se comprueba el encaje del fondo del cajón introduciendo el tablero en las ranuras. El fondo debe deslizar correctamente dentro del rail. En caso necesario, se realizan pequeños ajustes.

Step by step

How it goes together, step by step.

From the guide to the pieceTop piecesRailsBasesJoining piecesStrandad lamp
Parts
01Parts
Making
02Making
Assembly
03Assembly
The finished piece
04The finished piece
At home
05At home
01
Cutting list and initial cuts

You mark out the cutting list with 20 mm of extra allowance, cut on the sliding table saw and dress the wood on the surface planer and thicknesser down to the final 40 mm.

Cutting
02
The base pieces

An MDF template, a jigsaw to rough out and a bearing-guided router to reproduce the curve accurately. Temporarily fixing the three blanks together with double-sided tape lets you shape them at once.

Base
03
Drilling for the metal legs

On the pillar drill, with the piece held down with clamps, you drill the housings for the lamp's metal legs to a depth of 50 mm.

Drilling
04
The upper pieces

You repeat template, jigsaw and router; mark the dominoes with a square and make the diagonal joining cuts with a handsaw — by hand, and without rushing.

Top pieces
05
The central batten

From the rest of the board you cut three battens of 825 × 40 × 40 mm, the pieces that give the lamp its height, and finish off with their Domino mortises.

Rail
06
Assembly

Two beech triangles join the upper and lower pieces. Dry assembly, quick-set glue piece by piece and the domino joints: glue, mallet and clamps for at least 4 hours.

Assembly
07
Finishing and final assembly

A full sanding and Rubio Monocoat oil: spread it, let it work and wipe off with the grain. Fit the metal legs, put the shade on and switch it on.

Finish
What you'll use and learn

Tools, materials and techniques.

TOOLS
Sliding table saw
Jointer and thicknesser
Jigsaw
Router with bearing bit
Drill press
Domino joiner
Handsaw, square and clamps
MATERIALS
Kotibe (40 mm board)
Beech (joining pieces)
Strandad lamp as the starting point
Dominoes 6 × 40
Quick-set glue and cyanoacrylate
MDF template
Rubio Monocoat oil
TECHNIQUES
Oversize cutting and milling to 40 mm
Stacking three parts with double-sided tape
Jigsaw and template routing
Drilling the housings for the metal legs
Diagonal cuts with a handsaw
Domino joints and fitting the shade
The project kit
250 €
Guide + materials + workshop time
VAT-exempt training (art. 20.Uno.9º LIVA)
✓The step-by-step guide and the workshop templates
✓The kotibe, the beech, the donor IKEA lamp and all the materials
✓The PPE and the workshop tools
✓As much workshop time as you need, at your own pace
✓Help from the team whenever you need it
↻

At your own pace. You take the guide and the materials kit, and book your workshop time whenever suits you. No fixed dates, no groups.

Get the kit

Not sure it's your level? See the full itinerary.

Guided project · at your own pace

Start whenever you like. You pick the day.

Buy "«Strandad» Lamp" today and choose the day you start: your workshop access runs from that date, not from the day you pay. You build with our machines, our wood, and the team close by to lend a hand.

  • The wood and all the project materials
  • The complete guide in PDF, yours from minute one
  • Workshop access: 1 full month or 2 months of half-days — you choose, same price
  • The workshop team close by whenever you need them
One requirement, just one: to work with the machines you need the Made de Madera machine licence. If you don't have it yet, add the Machines Course to this same purchase and take it before starting your project.
1 · How you'll use the workshop

Same price either way — it's your pace, not your rate.

2 · The machine licence
3 · When you start

Pick your Machines Course date above and we'll tell you the first day you can start.

4 · Your details
Total today370 €project 250 € + Machines Course 120 €

Secure card payment (Stripe). Your invoice, the PDF guide and the getting-started instructions will land in your email. Your workshop access starts on the day you've chosen.

¿Te pilla lejos el taller?

Llévate solo la guía, en PDF.

La misma guía paso a paso que seguimos en el taller para construir ««Strandad» Lamp»: planos acotados, despiece, orden de montaje y los trucos de ebanista. Por 15 €, tuya para siempre — bueno, el enlace de descarga dura 30 días, así que no lo dejes criar polvo.

Ojo antes de comprar: la guía está escrita para la maquinaria y las plantillas de nuestro taller. En el tuyo puede faltarte alguna máquina o plantilla y tendrás que adaptar pasos por tu cuenta. No incluye madera, materiales ni tiempo de taller — eso es el proyecto guiado presencial de aquí al lado.
Una página real de la guía de ««Strandad» Lamp»
Una página de esta misma guía, tal cual la recibirás. Sin desenfoques misteriosos: lo que ves es lo que hay — planos, pasos y cero letra pequeña.

Pago seguro con tarjeta. Recibirás la factura y el enlace de descarga en tu email en unos minutos.

Before you even ask

Before you even ask.

Do I need any previous experience?

The guide explains each machine step by step, with its safe technique for use. No machine is used without that prior training, and the Made de Madera technician is in the workshop for any questions.

Is it safe to work with the machines?

The manual marks the mandatory PPE and the warnings for each machine at every stage. Gloves are forbidden on machines with rotating parts, and you'll always work with push sticks, clamps and the guards in place.

Which part comes from Ikea and which part do I make?

From the Strandad you keep the metal legs, the frame and the shade, and skip the circular base. The entire wooden structure you build yourself from the rough board.

Is everything included in the price?

Yes: the materials (the kotibe board, the beech, the dominoes, the donor IKEA lamp and the oil), the templates, the workshop machines, the PPE and your workshop time.

How long will it take me?

Everyone goes at their own pace: you follow the guide at your speed and there's no rush to finish in one session. The wood will wait for you.

If you need any adjustments to take part comfortably, let us know when you sign up and we'll have it ready.

250 €
Everything included
Get the kit