«Amber» Coffee Table
Two woods, exposed joinery and toughened glass floating on top. It looks like it came from a design shop — but you made it.
The finished pieceA glass-topped coffee table, from zero to finish.

Half-lap joints that demand precision. Best after a first project.
At your own pace. The guide gives the indicative time.
From rough battens to the frame with its tempered glass.
Cross housings on the table saw or by chisel, fine-tuned with a hand plane.
A guide that takes you by the hand, step by step.
Every phase of the project is explained on pages like this one: what you're going to do, how long it takes, what protection you need and where it usually goes wrong. You're never left wondering what's next.
Duración:30min



Para finalizar con la estructura exterior se debe realizar un rail para incorporar el fondo de la estructura. Esta plancha que hará de fondo es de DM de 6 mm Esta operación se realizará en las 4 piezas que conforman la estructura (laterales, base y top). Hay que tener en cuenta a la hora de ensamblar las piezas que el top es la ultima pieza que se debe ensamblar de la estructura. Se usará una fresa de 6,3mm


1Every step, illustratedSe determina la altura a la que se alojará el fondo del cajón. Para determinar la altura de la fresa se gira con una llave el disco situado enfrente hasta que la fresa toque con la regla, donde previamente hemos tenido que colocar la altura a la que queremos la fresa
El siguiente paso es ver a que distancia del borde se realiza el fresado. Nos ayudamos de la regla que hemos estado usando en el paso anterior para determinar la distancia, a la hora de medir la distancia tambien hay que tener en cuenta el diametro de la fresa una vez con la distancia conseguida se regula y se posiciona la guia paralela.
3Cada pieza se posiciona firmemente contra la guia de la máquina, manteniendo siempre la misma cara de referencia para asegurar la uniformidad en todas las ranuras. Se realiza el avance de forma continua y controlada.
Una vez mecanizadas todas las piezas, se comprueba el encaje del fondo del cajón introduciendo el tablero en las ranuras. El fondo debe deslizar correctamente dentro del rail. En caso necesario, se realizan pequeños ajustes.
How it goes together, step by step.





You mark out the cutting list in chalk leaving 20 mm of margin, cut oversize and run everything through the surface planer and thicknesser until the battens are flat and square.
The four legs carry crossed housings where the rails slot in: on the sliding table saw with the tenoning jig, or the classic way with marking gauge, chisel and mallet.
A guide batten cut to exact size, cuts on the sliding table saw and bandsaw with half a millimetre of margin, and fine fitting with the No. 93 plane. Every cut is repeated on the twin piece.
The ten supports are cut on the mitre saw with a stop, so they all come out at exactly 40 mm, and with a sacrificial board underneath so they don't splinter.
White glue in the housings, supports onto the rails and clamps while it dries. Then the structure: legs with the long rails, then the short ones, with a helping hand from the rubber mallet.
A full sanding, Rubio Monocoat oil with the grain, non-slip spacers and the toughened glass resting on top. Ready for the living room.
Tools, materials and techniques.
At your own pace. You take the guide and the materials kit, and book your workshop time whenever suits you. No fixed dates, no groups.
Not sure it's your level? See the full itinerary.
Start whenever you like. You pick the day.
Buy "«Amber» Coffee Table" today and choose the day you start: your workshop access runs from that date, not from the day you pay. You build with our machines, our wood, and the team close by to lend a hand.
- The wood and all the project materials
- The complete guide in PDF, yours from minute one
- Workshop access: 1 full month or 2 months of half-days — you choose, same price
- The workshop team close by whenever you need them
Llévate solo la guía, en PDF.
La misma guía paso a paso que seguimos en el taller para construir ««Amber» Coffee Table»: planos acotados, despiece, orden de montaje y los trucos de ebanista. Por 15 €, tuya para siempre — bueno, el enlace de descarga dura 30 días, así que no lo dejes criar polvo.

Before you even ask.
Do I need any previous experience?
The «Amber» is intermediate difficulty (3 out of 5). It helps to have used a machine or two before, but every step is explained with measurements and images, and the technician is there to answer questions. Each machine comes with its prior safety training.
Is it safe to work with these machines?
Yes, following the workshop's rules. The guide marks the mandatory PPE for each process, and no machine is used without first being taught its safe cutting technique.
Do I have to cut the glass too?
No. The 10 mm toughened glass comes already processed and cut to size. You focus on the wood, and at the end you rest the glass on the assembled structure.
How long will it take me?
The spec sheet estimates around 30 hours of work, spread over as many sessions as you need, at your own pace.
Which woods will I use?
Two contrasting solid woods: light (maple or beech) for the rails and dark (danta or walnut) for the legs and supports. You'll also learn to choose and prepare the wood.
What does the price include?
The materials (woods, toughened glass, spacers, glue and finish), the workshop machines, the PPE and as much workshop time as you need.
If you need any adjustments to take part comfortably, let us know when you sign up and we'll have it ready.


